Two public meetings will be held to present and discuss Phases 2 & 3 (Downtown) of the Connective Corridor Project in 2013. The intent of these meetings is to inform property and business owners along the Corridor route of 2013 construction logistics. These meetings will provide the same content but will be held on two different days, at different locations. Both meetings are open to the public.

The meetings are:

  • Wednesday, January 23, 2013 —9 a.m. to 10 a.m. at the Warehouse, 350 West Fayette Street, Fourth Floor Conference Room
  • Thursday, January 31, 2013 —9 a.m. to 10 a.m. at the Central New York Philanthropy Center, 431 East Fayette Street, Second Floor Ballroom

The agenda for both meetings will include the following topics:

  • Connective Corridor project update
  • Current status of design process
  • February tree removal
  • 2013 schedule/construction commencement
  • Construction logistics (location of work, traffic, etc.)
  • Civic Strip update
  • Façade grant program, round two
  • Fayette Street Sewer Separation Project

Speakers will include City Planning, City Engineering, City Arborist, SU and the Project Engineer on behalf of Onondaga County.